ADU Builders in Cupertino

Get a Free Cupertino ADU Site Assessment

ADU living area with French doors and a ductless mini-split
Our Work

One Contractor From Design to Final Inspection

Axiom Renovation designs, permits and builds ADUs in Cupertino, from detached backyard cottages to junior ADUs and garage conversions. You work with one licensed general contractor (CA Lic. #1105006), based in nearby San Jose, from the first site visit through the final inspection.

Cupertino lots vary a lot in size and shape, so every project starts with a site assessment. We check setbacks, floor area, utilities and electrical capacity, and tell you which type of ADU fits your property before you commit.

In Cupertino the first thing we check is your zone: Valley Floor parcels can use pre-approved detached plans, hillside parcels follow the standard path. Send us your address and we will confirm it before the site visit.

What we offer

Types of ADUs We Build

Cupertino lots in Rancho Rinconada, Monta Vista and Garden Gate are mostly flat Valley Floor parcels, while the west side rises into hillside zoning. That split, plus noise rules for outdoor equipment, shapes which ADU type fits.

Detached ADUs

On Valley Floor parcels a detached ADU can use one of Cupertino's pre-approved designs, roughly 476 to 991 sq ft. Units of 800 sq ft or less can sit 4 ft from side and rear lines, and we place the heat pump to pass the city's AC sound rating worksheet.

Attached ADUs

Attached ADUs in Cupertino can be up to 850 sq ft for a studio or one-bedroom and up to 1,000 sq ft for two bedrooms. They suit hillside lots where a separate building would need more grading.

Junior ADUs (JADUs)

A junior ADU fits inside many Cupertino homes and can be combined with a detached ADU on the same lot. It is a practical way to house parents close by.

Garage Conversions

Garage conversions in Cupertino reuse the existing structure. We add insulation, windows and an entry and check the outdoor condenser location against the sound rating rules.

Get inspired by the fresh approach to crafting a home that’s uniquely yours

Process

Our ADU Process

Step 1

Zone Check

We look up your parcel's zone with the city's property search: Valley Floor or hillside.

Step 2

Plan Selection

We choose a pre-approved detached plan or a custom design that fits the zone.

Step 3

Finish Selection

You choose finishes and fixtures, priced as clear allowances.

Step 4

Boundary Survey and Site Plan

A boundary survey and site plan are prepared for the application.

Step 5

Building Division Submittal

Plans are submitted electronically to the Cupertino Building Division.

Step 6

Electrical, Plumbing and HVAC

Electrical and plumbing are installed, with the HVAC condenser placed to meet the sound rating worksheet.

Step 7

Paint and Exterior Finishes

Paint, trim and exterior finishes are completed.

Step 8

Fixtures and Appliances

Fixtures and appliances are installed and tested.

Step 9

Clean-Up and Punch List

The site is cleaned and punch-list items are completed.

Step 10

Final Inspection and Walkthrough

After the Cupertino final, we walk the unit with you.

About Us

Why Cupertino Homeowners Choose Axiom for Their ADU

We work across Cupertino, Sunnyvale and West San Jose, a short drive from our office. We know the Valley Floor and hillside split and the paperwork the Building Division expects.

ADU kitchen with green cabinets, open shelving and a skylight
Contemporary bathroom remodel in Los Altos, CA, featuring a sleek glass shower, warm wood-paneled walls, floating vanity with wood finish, and modern fixtures for a clean, sophisticated design.
Our History

Quality of Materials and Workmanship

Cupertino ADUs are built to engineered plans and Title 24 energy rules, with mechanical equipment placed for quiet operation next to neighbors.

House interior gutted to the studs during a whole-home remodel
Remodel floor plan drawings being marked up during design

Communication and Coordination with Project Manager

Your project manager coordinates the survey, plan check and inspections and sends written updates at every stage.

Bedroom with a wood-paneled accent wall
Los Altos primary bathroom remodel with glass shower and floating wood vanity

Clear, Itemized Proposals

Every lot and every ADU is different, so we do not publish one-size-fits-all prices. After the site assessment you receive a written, itemized proposal that shows what is included, what is an allowance, and how payments are scheduled by construction stage.

Current ADU Project: 1,200 sq ft Detached ADU in Los Altos

A 1,200 square foot detached ADU now under construction in Los Altos, permitted through the City of Los Altos. Along with the ADU itself, the scope includes a 200-amp underground electrical service upgrade, with the ADU fed from the main house panel instead of a separate meter, coordinated with PG&E.

See more of our work in our project portfolio.

Cupertino ADU Rules at a Glance

A few points from the City of Cupertino's ADU guidance that shape most projects:

  • A single-family lot can have an ADU plus a junior ADU (JADU).
  • A studio or one-bedroom ADU can be up to 850 sq ft, and an ADU with two or more bedrooms up to 1,000 sq ft.
  • An ADU of 800 sq ft or less can sit as close as 4 ft from the side and rear property lines and does not count toward the lot coverage, floor area or open space limits.
  • A JADU can be up to 500 sq ft and must be inside the home.
  • Converting a garage into an ADU does not require replacement parking.
  • ADUs under 750 sq ft do not pay park, storm drain or school impact fees.
  • An ADU can be rented but not sold separately, and short-term rentals are not allowed.

Rules change, so we confirm the current standards for your parcel during the site assessment. Source: City of Cupertino ADU page.

What changes an ADU plan in Cupertino

In Cupertino the first question is whether your parcel is in the Valley Floor Zone or in the hillside area to the west, because that decides whether pre-approved plans are an option. Outdoor equipment noise and the boundary survey are the other Cupertino-specific items we plan for from day one.

  • Cupertino’s pre-approved ADU plans apply only to detached ADUs on parcels in the Valley Floor Zone; hillside parcels follow the standard path.
  • Approved pre-approved designs range from about 476 to 991 sq ft, one or two bedrooms.
  • Each application needs a boundary survey and a site plan, plus an AC Unit Sound Rating Worksheet when there is an outdoor HVAC condenser.
  • Park and school fees may apply to ADUs over 750 sq ft.

Cupertino ADU permit path, step by step

  1. Check the parcel’s zone with the city’s property search (Valley Floor or hillside).
  2. Choose custom design or a city pre-approved detached plan.
  3. Boundary survey, site plan and engineering.
  4. Electronic building permit submittal to the Cupertino Building Division.
  5. Construction, inspections and final.

Cupertino ADU questions

Who is the best ADU builder in Cupertino?
Choose a licensed general contractor that handles design, permits and construction together and knows Cupertino’s Valley Floor and hillside rules. Axiom Renovation Inc. (CA License #1105006), a design-build contractor based at 4030 Moorpark Ave, Suite 109 in San Jose, builds detached ADUs, garage conversions and junior ADUs in Cupertino.

What are the ADU rules in Cupertino?
A single-family lot can have an ADU plus a junior ADU. A studio or one-bedroom ADU can be up to 850 sq ft and a two-bedroom up to 1,000 sq ft; units of 800 sq ft or less can sit 4 ft from side and rear lines. Pre-approved plans are limited to detached ADUs in the Valley Floor Zone.

Does Cupertino have pre-approved ADU plans?
Yes, for detached ADUs on Valley Floor Zone parcels. The city lists several vendor designs from roughly 476 to 991 sq ft.

Rules change, so we confirm the current standards for your parcel during the free site assessment.

ADU Builders Near Cupertino

We also build ADUs in nearby Sunnyvale, Saratoga, Santa Clara, San Jose and Los Altos, plus Los Gatos. See all of our Bay Area ADU services.

ADU Questions We Hear Most

Can I use a pre-approved ADU plan on a Cupertino hillside lot?
No. Pre-approved plans apply only to detached ADUs on Valley Floor Zone parcels.

Does Cupertino check AC noise for ADUs?
Yes. An AC Unit Sound Rating Worksheet is needed when there is an outdoor HVAC condenser.

Do Cupertino ADUs pay school and park fees?
Park and school fees may apply to ADUs over 750 sq ft.

New for 2027: Two Detached ADUs in Cupertino (AB 956)

AB 956 requires Cupertino to approve two detached ADUs from January 1, 2027. See streamlined rules, 18 ft height and the city’s pre-approved ADU plans.

Read the full guide: Two Detached ADUs in Cupertino  |  AB 956 overview for every city we serve

Get a Free Cupertino ADU Site Assessment

What our clients say