ADU Builders in Campbell

Get a Free Campbell ADU Site Assessment

ADU living area with French doors and a ductless mini-split
Our Work

One Contractor From Design to Final Inspection

Axiom Renovation designs, permits and builds ADUs in Campbell, from detached backyard cottages to junior ADUs and garage conversions. You work with one licensed general contractor (CA Lic. #1105006), based in nearby San Jose, from the first site visit through the final inspection.

Every Campbell lot is different, so every project starts with a site assessment. We check setbacks, floor area, utilities and electrical capacity, and tell you which type of ADU fits your property before you commit.

Campbell lets one single-family lot combine a conversion ADU, a junior ADU and a detached ADU. Tell us your goals and we will show which combination fits your lot.

What we offer

Types of ADUs We Build

Campbell's mid-century neighborhoods around downtown and San Tomas have flat lots that suit nearly every ADU type. The main choices are which combination to build and whether an existing unpermitted unit should be legalized.

Detached ADUs

A detached Campbell ADU up to 800 sq ft with 4 ft side and rear setbacks is allowed by right, and local standards allow up to 1,200 sq ft. On historic properties a detached ADU is limited to 18 ft and one story.

Attached ADUs

Attached ADUs extend the home and can be paired with a junior ADU, giving two added units without building in the backyard.

Junior ADUs (JADUs)

A junior ADU can be added alongside a conversion ADU and a detached ADU on the same Campbell lot.

Garage Conversions

Campbell publishes sample plan sets for converting space into an ADU and for legalizing an existing ADU, which can shorten the drawing work for a garage conversion.

Get inspired by the fresh approach to crafting a home that’s uniquely yours

Process

Our ADU Process

Step 1

Site Visit and ADU Combination

We visit your Campbell property and choose the ADU combination.

Step 2

Design to the ADU Bulletin

Design follows Campbell's ADU bulletin.

Step 3

Finish Selection

You choose finishes, with allowances in the proposal.

Step 4

Site Preparation

The site is prepared and utilities are located.

Step 5

Online Permit Application

The application goes through Campbell's online permit system with no land use entitlement.

Step 6

Electrical and Plumbing

Electrical and plumbing are installed and inspected.

Step 7

Paint and Exterior Finishes

Paint and exterior finishes are completed.

Step 8

Fixtures and Appliances

Fixtures and appliances are installed and tested.

Step 9

Clean-Up and Punch List

The site is cleaned and punch-list items are completed.

Step 10

Final Inspection and Walkthrough

After the Campbell final, we walk the unit with you.

About Us

Why Campbell Homeowners Choose Axiom for Their ADU

Campbell is next to our San Jose office. We know the city's three-unit combination and the sample plan sets for legalization and conversions.

ADU kitchen with green cabinets, open shelving and a skylight
Contemporary bathroom remodel in Los Altos, CA, featuring a sleek glass shower, warm wood-paneled walls, floating vanity with wood finish, and modern fixtures for a clean, sophisticated design.
Our History

Quality of Materials and Workmanship

Campbell ADUs are built to engineered plans and Title 24 energy rules, with careful detailing on historic homes.

House interior gutted to the studs during a whole-home remodel
Remodel floor plan drawings being marked up during design

Communication and Coordination with Project Manager

One project manager coordinates the online permit, inspections and subcontractors and sends written updates.

Bedroom with a wood-paneled accent wall
Los Altos primary bathroom remodel with glass shower and floating wood vanity

Clear, Itemized Proposals

Every lot and every ADU is different, so we do not publish one-size-fits-all prices. After the site assessment you receive a written, itemized proposal that shows what is included, what is an allowance, and how payments are scheduled by construction stage.

Current ADU Project: 1,200 sq ft Detached ADU in Los Altos

A 1,200 square foot detached ADU now under construction in Los Altos, permitted through the City of Los Altos. Along with the ADU itself, the scope includes a 200-amp underground electrical service upgrade, with the ADU fed from the main house panel instead of a separate meter, coordinated with PG&E.

See more of our work in our project portfolio.

Campbell ADU Rules at a Glance

A few points from the City of Campbell ADU bulletin that shape most projects:

  • A single-family lot can have a conversion ADU, a junior ADU (JADU) and a detached ADU.
  • Under the local standards a detached ADU can be up to 1,200 sq ft. A detached ADU of up to 800 sq ft with 4 ft side and rear setbacks is allowed by right.
  • Detached ADUs can be up to 20 ft tall (18 ft and one story on historic properties).
  • Rear and side setbacks are 4 ft.
  • No parking is required for an ADU or JADU, and removed spaces do not have to be replaced.
  • Rentals shorter than 30 days are not allowed. Applications go through the city’s online permit system with no land use entitlement.

Source: City of Campbell ADU bulletin (March 2025). Rules change often, so we confirm the current standards for your parcel during the site assessment.

What changes an ADU plan in Campbell

Campbell allows a conversion ADU, a junior ADU and a detached ADU on the same single-family lot, which makes it one of the more flexible cities for adding units. The questions we settle first are which combination fits your lot and whether an existing unpermitted unit should be legalized instead.

  • Up to three units can be combined on a single-family lot: a conversion ADU, a junior ADU and a detached ADU.
  • A detached ADU up to 800 sq ft with 4 ft side and rear setbacks is allowed by right; local standards allow up to 1,200 sq ft.
  • Historic properties are limited to 18 ft and one story for a detached ADU.
  • Campbell publishes sample plan sets for legalizing an existing ADU and for converting space into an ADU.
  • The county-wide Santa Clara County ADU resource (aduscc.org) offers a guidebook and an ADU calculator.

Campbell ADU permit path, step by step

  1. Site visit and choice of ADU combination.
  2. Design and engineering to Campbell’s ADU bulletin.
  3. Application through the city’s online permit system, with no land use entitlement.
  4. Plan-check responses and permit issuance.
  5. Construction, inspections and final.

Campbell ADU questions

Who are the ADU builders in Campbell?
Axiom Renovation Inc. (CA License #1105006), a design-build contractor based at 4030 Moorpark Ave, Suite 109 in San Jose, designs, permits and builds detached ADUs, garage conversions and junior ADUs in Campbell.

Can I have two ADUs in Campbell?
Yes. A single-family lot can have a conversion ADU, a junior ADU and a detached ADU together.

Does an ADU in Campbell need parking?
No. Campbell requires no parking for an ADU or JADU, and removed spaces do not have to be replaced.

Rules change, so we confirm the current standards for your parcel during the free site assessment.

ADU Builders Near Campbell

We also build ADUs in nearby San Jose, Los Gatos, Saratoga and Santa Clara. See all of our Bay Area ADU services.

ADU Questions We Hear Most

Does Campbell require a planning entitlement for an ADU?
No land use entitlement is needed; the application goes through the city's online permit system.

Can I legalize an existing ADU in Campbell?
Yes. Campbell publishes sample plan sets for legalizing an existing ADU.

How tall can a detached ADU be on a historic Campbell property?
Up to 18 ft and one story.

New for 2027: Two Detached ADUs in Campbell (AB 956)

How AB 956 lets Campbell homeowners build two detached ADUs from January 1, 2027, and how Campbell’s ADU size, height, setback and tree rules apply.

Read the full guide: Two Detached ADUs in Campbell  |  AB 956 overview for every city we serve

Get a Free Campbell ADU Site Assessment

What our clients say