ADU Builders in Los Altos Hills

Get a Free Los Altos Hills ADU Site Assessment

ADU living area with French doors and a ductless mini-split
Our Work

One Contractor From Design to Final Inspection

Axiom Renovation designs, permits and builds ADUs in Los Altos Hills, from detached backyard cottages to junior ADUs and garage conversions. You work with one licensed general contractor (CA Lic. #1105006), based in nearby San Jose, from the first site visit through the final inspection.

Los Altos Hills lots are large but often sloped, with long driveways and septic or sewer questions to settle early. Every project starts with a site assessment. We check setbacks, grading, utilities and electrical capacity, and tell you which type of ADU fits your property before you commit.

Los Altos Hills ADUs often depend on septic capacity, slope and the Town's development area limits. Send us your address and we will check sewer or septic status before the first visit.

What we offer

Types of ADUs We Build

Los Altos Hills lots are large and often sloped, many homes use septic systems, and the Town tracks Maximum Development Area and Maximum Floor Area. Those limits decide the ADU type more than the yard size.

Detached ADUs

A detached ADU in Los Altos Hills can be up to 1,200 sq ft, including any internally connected basement. Its sewer connection must sit downstream of the main house's building drain, and a geotechnical report goes with the permit.

Attached ADUs

An attached ADU can be up to 50% of the home. On sloped lots it can use existing grading and access, which keeps development area lower.

Junior ADUs (JADUs)

A junior ADU of up to 500 sq ft inside the existing home adds a unit without using new development area.

Garage Conversions

Converting an existing garage or accessory building reuses floor area the Town already counts, which helps when MDA or MFA is close to the limit.

Get inspired by the fresh approach to crafting a home that’s uniquely yours

Process

Our ADU Process

Step 1

Town Staff Consultation

We consult Town staff on the permitting process for your parcel.

Step 2

Septic Capacity Check

If not on sewer, County Environmental Health confirms septic capacity first.

Step 3

Pre-Application Meeting

We hold the pre-application meeting with plans and MDA/MFA worksheets.

Step 4

Geotechnical Review

A geotechnical engineer reviews slope and foundation conditions.

Step 5

Building Permit Submittal

The building permit is submitted; the Town acts within 60 days of a complete application.

Step 6

Utilities and Septic Tie-In

Utilities, including sewer or septic tie-ins, are installed and inspected.

Step 7

Exterior Finishes

Exterior finishes are chosen to fit the hillside setting.

Step 8

Fixtures and Appliances

Fixtures and appliances are installed and tested.

Step 9

Clean-Up and Erosion Control

The site is cleaned and erosion control is maintained through final.

Step 10

Final Inspection and Walkthrough

After the Town final inspection, we walk the unit with you.

About Us

Why Los Altos Hills Homeowners Choose Axiom for Their ADU

We work on hillside and septic lots in Los Altos Hills and Los Altos. We plan septic, geotechnical and development area questions first, so design is done once.

ADU kitchen with green cabinets, open shelving and a skylight
Contemporary bathroom remodel in Los Altos, CA, featuring a sleek glass shower, warm wood-paneled walls, floating vanity with wood finish, and modern fixtures for a clean, sophisticated design.
Our History

Quality of Materials and Workmanship

Hillside ADUs are built to engineered foundations, geotechnical recommendations and Title 24 energy rules.

House interior gutted to the studs during a whole-home remodel
Remodel floor plan drawings being marked up during design

Communication and Coordination with Project Manager

One project manager coordinates County Environmental Health, the geotechnical engineer and Town inspections and sends written updates.

Bedroom with a wood-paneled accent wall
Los Altos primary bathroom remodel with glass shower and floating wood vanity

Clear, Itemized Proposals

Every lot and every ADU is different, so we do not publish one-size-fits-all prices. After the site assessment you receive a written, itemized proposal that shows what is included, what is an allowance, and how payments are scheduled by construction stage.

Current ADU Project: 1,200 sq ft Detached ADU in Los Altos

A 1,200 square foot detached ADU now under construction in Los Altos, permitted through the City of Los Altos. Along with the ADU itself, the scope includes a 200-amp underground electrical service upgrade, with the ADU fed from the main house panel instead of a separate meter, coordinated with PG&E.

See more of our work in our project portfolio.

Los Altos Hills ADU Rules at a Glance (2026)

  • Units allowed now: one ADU and/or one JADU on any R-A property with an existing single-family home, regardless of lot size.
  • Size: an ADU of up to 800 sq ft; up to 850 sq ft (studio or one bedroom) or 1,000 sq ft (two bedrooms) if your Maximum Development Area (MDA) and Maximum Floor Area (MFA) allow; up to 1,200 sq ft with one on-site parking space and 30 ft side and rear setbacks.
  • MDA and MFA: a new ADU of up to 800 sq ft is exempt from both. Area above 800 sq ft counts toward them.
  • Height: 16 ft, or 19 ft with an on-site parking space and 30 ft side and rear setbacks.
  • Setbacks: 40 ft front; 4 ft side and rear.
  • Parking: one on-site space (tandem or in a setback is allowed), with exemptions near transit and for conversions. The ADU must use the existing driveway.
  • Where an ADU cannot go: inside a Heritage Oak’s critical root zone, on slopes over 30%, within 25 ft of the top of a creek bank, in a recorded easement, or in a geotechnical or seismic hazard zone.
  • Design: exterior materials, windows and roof to match the main house; wall colors with a light reflectivity value of 50 or less and roofs of 40 or less; shielded, downward-facing lighting.
  • Process: ministerial, with no Site Development Review. It starts with a pre-application meeting with a Town planner, then a building permit application. Planning: 650-941-7222.

State review of the Town’s ADU rules

In a January 26, 2026 letter, the California Department of Housing and Community Development (HCD) found that parts of the Town’s ADU and SB 9 code do not comply with state law. The issues included the 16 ft height limit for detached ADUs, which must include the state’s 18 and 20 ft exceptions; requiring sprinklers in the existing house when an ADU is added; and the 650 sq ft JADU option. Where the Town’s code is stricter than state law, state law applies. We check the Town’s current code for every project.

What changes an ADU plan in Los Altos Hills

Los Altos Hills is different from the valley cities: many homes are on septic systems, lots are large and sloped, and the Town reviews development area and floor area worksheets before the building permit. We plan for these from the start.

  • If the property is not on Town sewer, Santa Clara County Environmental Health must confirm the septic system can serve the ADU before building permit submittal.
  • A detached ADU’s sewer connection must be placed downstream of the main house’s building drain.
  • A detached ADU can be up to 1,200 sq ft, including any internally connected basement; a junior ADU up to 500 sq ft.
  • The Town requires a pre-application meeting with the Maximum Development Area (MDA) and Maximum Floor Area (MFA) worksheets.
  • Building permit submittals include a geotechnical report.

Los Altos Hills ADU permit path, step by step

  1. Staff consultation on the permitting process and codes.
  2. Septic capacity confirmation from County Environmental Health, if not on sewer.
  3. Pre-application meeting with plans, MDA/MFA worksheets and zoning checklist.
  4. Building permit submittal with geotechnical report; the Town acts within 60 days of a complete application.
  5. Construction, inspections and final.

Los Altos Hills ADU questions

Who builds ADUs in Los Altos Hills?
Axiom Renovation Inc. (CA License #1105006), a design-build contractor based at 4030 Moorpark Ave, Suite 109 in San Jose, designs, permits and builds ADUs on hillside and septic lots in Los Altos Hills.

Can I build an ADU on a septic system in Los Altos Hills?
Often yes, but Santa Clara County Environmental Health must confirm the septic system can serve the ADU before you submit for a building permit.

How big can an ADU be in Los Altos Hills?
A detached ADU can be up to 1,200 sq ft, including any internally connected basement; an attached ADU up to 50% of the home; a junior ADU up to 500 sq ft.

Rules change, so we confirm the current standards for your parcel during the free site assessment.

Two Detached ADUs from January 1, 2027 (AB 956)

AB 956 raises the number of detached ADUs the Town must approve on a single-family lot from one to two. The Town may limit each to 800 sq ft of living space and apply height limits, and side and rear setbacks can be no more than 4 ft. If two detached ADUs are built, the Town does not have to also approve a JADU. How the Town applies its MDA and MFA exemption to a second ADU will depend on its ordinance update.

  • Placement: we map slopes, oak root zones, creek setbacks and easements first, since they decide where two units can sit.
  • Driveway and parking: ADUs use the existing driveway, so access and parking for two units have to work from it.
  • Sewer or septic: properties near a public sewer must connect, and septic properties need County review. We confirm which applies early.
  • Fire safety: parts of the Town are in mapped fire hazard severity zones. Fire access and wildfire-resistant construction shape the design.
  • Electrical: two units usually need a load calculation and often a service upgrade. We coordinate PG&E work from the start.

Read our full guide: Two Detached ADUs in Los Altos Hills, the neighboring Los Altos guide, or the AB 956 overview.

ADU Builders Near Los Altos Hills

We also build ADUs in nearby Los Altos, Palo Alto, Mountain View and Los Altos Hills. See all of our Bay Area ADU services.

ADU Questions We Hear Most

Does a Los Altos Hills ADU need a geotechnical report?
Building permit submittals include a geotechnical report.

Where must a detached ADU's sewer connect in Los Altos Hills?
Downstream of the main house's building drain.

Is there a pre-application step in Los Altos Hills?
Yes, a pre-application meeting with the MDA and MFA worksheets.

Get a Free Los Altos Hills ADU Site Assessment

What our clients say