ADU Builders in San Mateo

Get a Free San Mateo ADU Site Assessment

ADU living area with French doors and a ductless mini-split
Our Work

One Contractor From Design to Final Inspection

Axiom Renovation designs, permits and builds ADUs in San Mateo, from detached backyard cottages to junior ADUs and garage conversions. You work with one licensed general contractor (CA Lic. #1105006), based in San Jose and building across the Peninsula, from the first site visit through the final inspection.

San Mateo lots range from flat parcels to hillside properties, so every project starts with a site assessment. We check setbacks, daylight plane, floor area, utilities and electrical capacity, and tell you which type of ADU fits your property before you commit.

San Mateo has no fixed maximum ADU size, but the unit must be smaller than the main home. Send us your house size and lot details and we will show the realistic options.

What we offer

Types of ADUs We Build

San Mateo neighborhoods from Baywood and Aragon to Hayward Park mix older two-story homes with flat lots near transit. Height limits, the daylight plane and the solar rule for new detached units shape our designs.

Detached ADUs

A detached San Mateo ADU can be up to 16 ft to the top plate and 24 ft to the roof peak under a daylight plane starting at 12 ft. New detached ADUs must include solar, and up to 800 sq ft is exempt from floor area limits.

Attached ADUs

Attached ADUs in San Mateo must stay smaller than the main home. They suit lots where the daylight plane limits a separate building.

Junior ADUs (JADUs)

A junior ADU is approved ministerially with a building permit only, and adds a unit without new footprint.

Garage Conversions

Garage conversions reuse existing floor area. Where a new ADU needs parking, one tandem or uncovered space is generally enough, with waivers near transit.

Get inspired by the fresh approach to crafting a home that’s uniquely yours

Process

Our ADU Process

Step 1

Code Consultation

We start with a code consultation at the San Mateo counter.

Step 2

Design to ADU Standards

Design follows the ADU/JADU standards or the city's pre-approved plans guide.

Step 3

Finish Selection

You choose finishes, with allowances in the proposal.

Step 4

Solar Planning

Solar layout is planned for new detached ADUs.

Step 5

Building Permit Submittal

The building permit is submitted; no planning application for a compliant unit.

Step 6

Electrical, Solar and Plumbing

Electrical, solar and plumbing are installed and inspected.

Step 7

Paint and Exterior Finishes

Paint and exterior finishes are completed.

Step 8

Fixtures and Appliances

Fixtures and appliances are installed and tested.

Step 9

Clean-Up and Punch List

The site is cleaned and punch-list items are completed.

Step 10

Final Inspection and Walkthrough

After the San Mateo final, we walk the unit with you.

About Us

Why San Mateo Homeowners Choose Axiom for Their ADU

We build on the Peninsula as well as in the South Bay. We design San Mateo ADUs to the daylight plane and solar rules from the start.

ADU kitchen with green cabinets, open shelving and a skylight
Contemporary bathroom remodel in Los Altos, CA, featuring a sleek glass shower, warm wood-paneled walls, floating vanity with wood finish, and modern fixtures for a clean, sophisticated design.
Our History

Quality of Materials and Workmanship

San Mateo ADUs are built to engineered plans and Title 24 energy rules, with solar included on new detached units.

House interior gutted to the studs during a whole-home remodel
Remodel floor plan drawings being marked up during design

Communication and Coordination with Project Manager

One project manager coordinates plan check, solar, inspections and subcontractors and sends written updates.

Bedroom with a wood-paneled accent wall
Los Altos primary bathroom remodel with glass shower and floating wood vanity

Clear, Itemized Proposals

Every lot and every ADU is different, so we do not publish one-size-fits-all prices. After the site assessment you receive a written, itemized proposal that shows what is included, what is an allowance, and how payments are scheduled by construction stage.

Current ADU Project: 1,200 sq ft Detached ADU in Los Altos

A 1,200 square foot detached ADU now under construction in Los Altos, permitted through the City of Los Altos. Along with the ADU itself, the scope includes a 200-amp underground electrical service upgrade, with the ADU fed from the main house panel instead of a separate meter, coordinated with PG&E.

See more of our work in our project portfolio.

San Mateo ADU Rules at a Glance

A few points from the City of San Mateo ADU and JADU standards that shape most projects:

  • San Mateo sets no maximum ADU size, but an ADU must be smaller than the main home. Up to 800 sq ft is exempt from floor area limits, and larger units count toward the zoning district’s FAR.
  • A JADU can be up to 500 sq ft, within the walls of the home.
  • A detached ADU can be up to 16 ft to the top plate and 24 ft to the roof peak. An attached ADU can be up to 24 ft to the top plate and 32 ft to the peak.
  • Side and rear setbacks are 4 ft, with a daylight plane that starts at 12 ft.
  • A new ADU generally needs one off-street space, which can be tandem or uncovered, with waivers near transit. A JADU needs none.
  • Compliant ADUs need only a building permit. New detached ADUs must include solar, and rentals shorter than 30 days are not allowed.

Source: City of San Mateo ADU/JADU standards handout (updated 2025). Rules change often, so we confirm the current standards for your parcel during the site assessment.

What changes an ADU plan in San Mateo

San Mateo has no fixed maximum ADU size, but the unit must be smaller than the main home and anything over 800 sq ft counts toward floor area. Height, the daylight plane and the solar requirement for new detached units shape most San Mateo designs.

  • A detached ADU can be up to 16 ft to the top plate and 24 ft to the roof peak, under a daylight plane that starts at 12 ft.
  • New detached ADUs must include solar.
  • A new ADU generally needs one off-street space, tandem or uncovered, with waivers near transit.
  • Compliant ADUs and JADUs are approved ministerially with a building permit only.

San Mateo ADU permit path, step by step

  1. Code consultation at the city counter (weekday mornings, afternoons by appointment).
  2. Design to the ADU/JADU standards, or use the city’s pre-approved ADU plans guide.
  3. Building permit submittal (no planning application for a compliant unit).
  4. Plan-check responses and permit issuance.
  5. Construction, inspections and final.

San Mateo ADU questions

Who builds ADUs in San Mateo?
Axiom Renovation Inc. (CA License #1105006), a design-build contractor based at 4030 Moorpark Ave, Suite 109 in San Jose, designs, permits and builds detached and attached ADUs and junior ADUs in San Mateo.

How big can an ADU be in San Mateo?
There is no fixed maximum, but the ADU must be smaller than the main home; up to 800 sq ft is exempt from floor area limits.

Does a new ADU in San Mateo need solar?
Yes, new detached ADUs must include solar.

Rules change, so we confirm the current standards for your parcel during the free site assessment.

ADU Builders Near San Mateo

We also build ADUs across the Peninsula and South Bay, including Palo Alto, Los Altos and Mountain View. See all of our Bay Area ADU services.

ADU Questions We Hear Most

Does a San Mateo ADU need a planning application?
No. Compliant ADUs and JADUs are approved ministerially with a building permit only.

What is the height limit for a detached ADU in San Mateo?
Up to 16 ft to the top plate and 24 ft to the roof peak, under a daylight plane starting at 12 ft.

Does a new San Mateo ADU need parking?
Generally one off-street space, tandem or uncovered, with waivers near transit.

New for 2027: Two Detached ADUs in San Mateo (AB 956)

AB 956 lets San Mateo homeowners build two detached ADUs from January 1, 2027. How San Mateo’s 2026 ADU ordinance, heights and no-parking rule apply.

Read the full guide: Two Detached ADUs in San Mateo  |  AB 956 overview for every city we serve