Home Additions in Millbrae, CA

Get a Free Millbrae Addition Consultation

Staff Review or Planning Commission

Ground floor vs. second floor: in Millbrae, ground-floor additions are reviewed by staff, usually within about a week, and a fully compliant ground-floor job can often get a building permit within about a month. All non-ground-floor changes need Design Review by the Planning Commission, with a study session, then a public hearing; notice goes to owners within 300 feet, the Commission meets on the first and third Mondays, and there is a 10-day appeal period. Plan on 2 to 3 months to reach approval.

R-1 limits: 55% floor area ratio, 50% lot coverage, 30 feet with a 3:12 or steeper roof (25 feet for flatter roofs), setbacks of 20 feet front, 5 feet sides and 10 feet rear, with upper floors set back another 10 feet at the front and sides. Areas sloped over 30% are excluded from net lot area.

Addition Work

Addition with sliding doors
Addition with sliding doors
Addition at dusk
Addition at dusk
Siding on an addition
Siding on an addition

Fees and Utilities

  • Additions over 500 sq ft must show school fee receipts from San Mateo Union High School District and Millbrae Elementary School District before permit.
  • Fire plans go to Central County Fire, 1399 Rollins Road, Burlingame, with an 8 to 10 business day review.
  • In mapped flood zones, improvements over 50% of market value within 5 years count as substantial improvement.

Sewer lateral: added plumbing fixtures or work on 25% or more of the structure starts with an Engineering determination and a video inspection of the sewer lateral.

Before final: a Waste Management Plan final summary showing 65% diversion must be approved before the final inspection can be scheduled. Construction hours: 7:30 a.m. to 7 p.m. weekdays, 8 a.m. to 6 p.m. Saturdays, 9 a.m. to 6 p.m. Sundays and holidays.

Millbrae Community Development
621 Magnolia Avenue, Millbrae, CA 94030
Building (650) 259-2330 · Planning (650) 259-2341 · Engineering (650) 259-2339
All building permits go through the City’s online portal (eProcess360); paper applications are not accepted. Inspections are scheduled by email to the Permit Technician or at (650) 259-2330, at least a day ahead. Posted counter and inspection hours vary between City pages, so call ahead.

Explore More

Other Millbrae services: ADUs · Bathrooms · Kitchens · New Homes · Millbrae overview

Same service nearby: Burlingame · San Bruno · Hillsborough

See second story additions.

Millbrae Home Additions FAQ

Does a second-story addition need a hearing in Millbrae?

Yes. All non-ground-floor changes go to Planning Commission Design Review.

How long does second-story approval take?

Typically 2 to 3 months to Planning Commission approval.

What is the floor area limit?

55% floor area ratio in R-1.

Can a ground-floor addition be approved by staff?

Yes, usually within about a week if it complies.

Get a Free Millbrae Addition Consultation

What our clients say