Home Remodeling, ADUs & Additions in Morgan Hill

Get a Free Morgan Hill Project Consultation

Morgan Hill General Contractor for ADUs, Additions and Remodels

Axiom Renovation (CA Lic. #1105006) builds ADUs, additions, remodels, pools and outdoor living projects in Morgan Hill. Morgan Hill has a mix of city lots and larger estate and hillside parcels, and its ADU size limits depend on the zoning district.

We handle design, City review, the building permit and construction, including solar and all-electric requirements for new units.

What We Build in Morgan Hill

See finished work in our portfolio.

Morgan Hill ADU Rules at a Glance

  • A single-family lot can have a detached ADU, an attached ADU and a JADU.
  • Maximum ADU size depends on the zone: 1,200 sq ft in RE 10, 1,000 sq ft in RE 2.5, and 850 sq ft (one bedroom) or 1,000 sq ft (two or more bedrooms) in most other districts. JADUs can be up to 500 sq ft.
  • Attached ADUs can be up to 25 ft or the district limit; detached ADUs that do not meet main-home setbacks are limited to 16 ft (18 ft near transit, plus 2 ft for roof pitch).
  • Side and rear setbacks are 4 ft. One parking space is generally required, with exemptions.
  • New units need solar, detached ADUs generally cannot use natural gas, and a detached ADU needs a dedicated water meter.
  • No impact fees under 750 sq ft. Morgan Hill has a gallery of pre-reviewed detached ADU designs.

Sources: City of Morgan Hill ADU page and ADU checklists.

Rules change often, so we confirm the current standards for your parcel during the site assessment.

Other Morgan Hill Rules That Affect Your Project

  • Hillside, high-fire and flood areas may need extra applications; development must avoid slopes of 20% or more in the Hillside Combining District.
  • Exempt work: fences up to 7 ft, retaining walls up to 4 ft (unsurcharged), sheds of 120 sq ft or less, and low decks of 200 sq ft or less generally do not need a building permit. In-ground pools and spas do.
  • Trees: native trees 6 in. or more in diameter and any tree 13 in. or more are protected and need a permit to remove.
  • Stormwater: 2,500 sq ft or more of new or replaced impervious surface, such as patios and driveways, triggers post-construction stormwater requirements.
  • Septic lots need a separate septic system for a detached ADU.

Getting Permits in Morgan Hill

Morgan Hill recommends talking to Planning before applying, and plan review status is tracked through eTRAKiT.

We Also Work Near Morgan Hill

We also build in nearby Gilroy, San Martin, San Jose, and across the Bay Area. See all of our service areas.

Frequently Asked Questions

How big can an ADU be in Morgan Hill?

It depends on the zoning district: up to 1,200 sq ft in RE 10, 1,000 sq ft in RE 2.5, and 850 or 1,000 sq ft in most other districts.

Do I need a permit for a pool in Morgan Hill?

Yes. In-ground pools and spas need a building permit in Morgan Hill.

Do patios and driveways trigger stormwater rules in Morgan Hill?

Projects that add or replace 2,500 sq ft or more of impervious surface trigger post-construction stormwater requirements.

Do new ADUs in Morgan Hill need solar?

Yes. Solar is required on new units, and detached ADUs generally cannot use natural gas.

Get a Free Morgan Hill Project Consultation

What our clients say