Kitchen Remodeling in Atherton, CA

Get a Free Atherton Kitchen Consultation

Kitchens for Atherton Estates

Atherton kitchens are often designed with a main kitchen and a catering or prep kitchen, professional appliances, large islands and walls of doors to terraces. Atherton has no residential all-electric mandate, so gas ranges remain an option, while new work must meet electric-ready rules.

Kitchen Projects

Great room with fireplace and kitchen
Great room with fireplace and kitchen
Black hood with brass trim
Black hood with brass trim
Island and wall ovens
Island and wall ovens
White oak and quartz kitchen
White oak and quartz kitchen

Permits and Logistics

Town of Atherton Building Department
Permits and plan check go through the Town Building Department at Town Hall; call the Town to confirm current counter hours before visiting.
Fire: Menlo Park Fire Protection District, Fire Prevention, 170 Middlefield Road, Menlo Park, (650) 688-8400 · Sewer: West Bay Sanitary District, 500 Laurel Street, Menlo Park, (650) 321-0384.
A Construction, Operation and Parking (COP) plan must be approved by the Building Official before plans go to plan check.

Construction hours: construction, pickups and deliveries are allowed only 8 a.m. to 5 p.m., Monday to Friday, with no contractor work on Saturdays, Sundays or Town holidays. Construction vehicles cannot arrive before 8 a.m., must leave by 5 p.m., and must turn engines off while loading.

Permit time limits: 12 months for projects of 2,000 sq ft or less, 24 months up to 4,000 sq ft, and 36 months above that. We schedule to stay inside these limits.

Explore More

Other Atherton services: ADUs · Bathrooms · Additions · New Homes · Atherton overview

Same service nearby: Menlo Park · Palo Alto · Los Altos Hills

Atherton Kitchen Remodeling FAQ

Can I install a gas range in Atherton?

Yes. Atherton requires electric-ready construction but no residential all-electric mandate.

When can deliveries arrive?

Only 8 a.m. to 5 p.m., Monday to Friday.

How long is a permit valid?

12 to 36 months depending on project size.

How long does a kitchen remodel take?

Construction usually runs a couple of months.

Get a Free Atherton Kitchen Consultation

What our clients say