ADU Builder in Atherton, CA

Get a Free Atherton ADU Consultation

Atherton ADU Rules

Under Chapter 17.52, a single-family lot may have one ADU plus one JADU, and lots of 2 acres or more may add a deed-restricted bonus ADU.

  • Size: new ADUs up to 1,200 sq ft; JADUs up to 500 sq ft; conversions of existing space have no size limit.
  • Height: detached 16 feet (18 near transit); attached 25 feet or the zone limit.
  • Setbacks: 4 feet side and rear for ADUs of 800 sq ft or less.
  • Floor area: the first 800 sq ft of an ADU and up to 500 sq ft of a JADU do not count toward the home’s maximum.
  • Parking: at most one space, and none in many cases.
  • Rentals: longer than 30 days; no owner-occupancy requirement for units permitted since 2020.

Review is ministerial, with no hearing, and a decision within 60 days of a complete application.

ADU Construction

ADU framing
ADU framing
Vaulted ADU framing
Vaulted ADU framing
ADU roof sheathing
ADU roof sheathing
ADU bathroom
ADU bathroom

Building an ADU on an Atherton Estate

Construction hours: construction, pickups and deliveries are allowed only 8 a.m. to 5 p.m., Monday to Friday, with no contractor work on Saturdays, Sundays or Town holidays. Construction vehicles cannot arrive before 8 a.m., must leave by 5 p.m., and must turn engines off while loading.

Heritage trees: a tree is protected at 48 inches in circumference (about 15 inches diameter) at 54 inches above grade. Native oaks qualify anywhere on the lot; other species qualify outside the main buildable area. Staff can approve removal of dead or dangerous trees; other removals go to the Planning Commission, and a heritage oak removed from the buildable area is replaced with a 48-inch box oak.

Town of Atherton Building Department
Permits and plan check go through the Town Building Department at Town Hall; call the Town to confirm current counter hours before visiting.
Fire: Menlo Park Fire Protection District, Fire Prevention, 170 Middlefield Road, Menlo Park, (650) 688-8400 · Sewer: West Bay Sanitary District, 500 Laurel Street, Menlo Park, (650) 321-0384.
A Construction, Operation and Parking (COP) plan must be approved by the Building Official before plans go to plan check.

Explore More

Other Atherton services: Bathrooms · Kitchens · Additions · New Homes · Atherton overview

Same service nearby: Menlo Park · Palo Alto · Los Altos Hills

See how to build an ADU.

Atherton ADU Builder FAQ

How large can an ADU be in Atherton?

Up to 1,200 sq ft for a new ADU; conversions of existing space have no size limit.

Does an ADU count toward floor area?

The first 800 sq ft of an ADU does not.

Is there a hearing?

No. ADU review is ministerial, decided within 60 days.

Can I build two ADUs?

One ADU plus one JADU, and lots of 2 acres or more may add a deed-restricted bonus ADU.

Get a Free Atherton ADU Consultation

What our clients say