New Home Construction in Millbrae, CA

Get a Free Millbrae New Home Consultation

Building New in Millbrae

Ground floor vs. second floor: in Millbrae, ground-floor additions are reviewed by staff, usually within about a week, and a fully compliant ground-floor job can often get a building permit within about a month. All non-ground-floor changes need Design Review by the Planning Commission, with a study session, then a public hearing; notice goes to owners within 300 feet, the Commission meets on the first and third Mondays, and there is a 10-day appeal period. Plan on 2 to 3 months to reach approval.

R-1 limits: 55% floor area ratio, 50% lot coverage, 30 feet with a 3:12 or steeper roof (25 feet for flatter roofs), setbacks of 20 feet front, 5 feet sides and 10 feet rear, with upper floors set back another 10 feet at the front and sides. Areas sloped over 30% are excluded from net lot area.

Construction in Progress

Framing on new construction
Framing on new construction
Roof sheathing
Roof sheathing
Eave and fascia framing
Eave and fascia framing

Ask us about recent new-home and rebuild projects during your consultation.

Requirements

  • Protected trees under the 2024 tree ordinance need a removal permit and replanting; include landscape plans with the building permit.
  • Synthetic turf is not allowed.
  • School fee receipts from both districts before permit.

Sewer lateral: added plumbing fixtures or work on 25% or more of the structure starts with an Engineering determination and a video inspection of the sewer lateral.

Before final: a Waste Management Plan final summary showing 65% diversion must be approved before the final inspection can be scheduled. Construction hours: 7:30 a.m. to 7 p.m. weekdays, 8 a.m. to 6 p.m. Saturdays, 9 a.m. to 6 p.m. Sundays and holidays.

Millbrae Community Development
621 Magnolia Avenue, Millbrae, CA 94030
Building (650) 259-2330 · Planning (650) 259-2341 · Engineering (650) 259-2339
All building permits go through the City’s online portal (eProcess360); paper applications are not accepted. Inspections are scheduled by email to the Permit Technician or at (650) 259-2330, at least a day ahead. Posted counter and inspection hours vary between City pages, so call ahead.

Explore More

Other Millbrae services: ADUs · Bathrooms · Kitchens · Additions · Millbrae overview

Same service nearby: Burlingame · San Bruno · Hillsborough

See our custom home builder page.

Millbrae New Home Construction FAQ

Does a new two-story home need Planning Commission review?

Yes, Design Review with a study session and public hearing.

How tall can a new home be?

30 feet with a 3:12 or steeper roof.

Is synthetic turf allowed?

No.

When does the Planning Commission meet?

The first and third Mondays.

Get a Free Millbrae New Home Consultation

What our clients say