Because Mountain View has no single-family design review, a new home that meets the R1 standards goes straight to building plan check. The City estimates 5 to 8 months to permit a new home. Demolition, excavation, flood and fire sprinkler permits are issued separately.

Mountain View has no discretionary design review for single-family homes and does not require notice to neighbors. A Planning permit is needed only for exceptions such as a variance or floor-area exception, a conforming addition to a nonconforming home, exterior changes to a historic home, or lots of 10,000 sq ft or more next to a creek. Those go to the Zoning Administrator, who holds hearings on the second and fourth Wednesdays with mailed notice within 750 feet.

Construction in Progress

Roof sheathing
Roof sheathing
Utility trenching
Utility trenching
House wrap and siding
House wrap and siding

Ask us about recent new-home and rebuild projects during your consultation.

New-Home Requirements

2025 Mountain View Green Building Code (permits submitted from January 1, 2026): new homes and ADUs need heat-pump space and water heating, solar, battery-ready wiring and a Level 2 charger of at least 40 amps. In existing homes, installing or replacing a gas appliance requires electric-ready wiring, and replacing an air conditioner requires a heat pump or making the home heat-pump ready.

  • At least 200-amp electrical service.
  • A wet-signed survey certificate, delivered to the field inspector before the concrete pour, for structures within 6 feet of a property line.
  • Fire sprinklers, with Fire inspections at 650-903-6313 ext. 0.
  • City water, about 87% from the San Francisco Public Utilities Commission, and City sewer treated at the Palo Alto Regional Water Quality Control Plant.
  • Flood Development Permit in mapped flood zones near the Bay and Permanente Creek.
Mountain View Permit Center
City Hall, 500 Castro Street, Mountain View, CA 94041
Building (650) 903-6313 (Fire ext. 0) · Planning (650) 903-6306 · Public Works (650) 903-6311
Public counters Monday to Friday, 8 a.m. to 4 p.m., plus a Virtual Public Counter. All Building, Fire, Planning, Public Works and Heritage Tree applications go through ePermitsMV; building inspections are scheduled there.

Explore More

Other Mountain View services: Bathrooms · Kitchens · Additions · Mountain View ADU builder · Mountain View overview

Same service nearby: Sunnyvale · Los Altos · Palo Alto

See our custom home builder page.

Mountain View New Home Construction FAQ

How long does a new home permit take in Mountain View?

The City estimates 5 to 8 months.

Do new homes need heat pumps?

Yes. New homes need heat-pump space and water heating, solar, battery-ready wiring and a Level 2 charger.

Is there design review?

No discretionary design review for single-family homes.

Who treats Mountain View wastewater?

The Palo Alto Regional Water Quality Control Plant.