New Home Construction in Palo Alto, CA

Get a Free Palo Alto New Home Consultation

Building New in Palo Alto

Two-story Objective Design Standards (effective February 14, 2025) apply to new two-story homes and second-story additions of 150 sq ft or more, unless you choose Individual Review. The second floor is capped at the larger of 35% of allowable floor area or 400 sq ft, and roof decks are not allowed. Under Individual Review, notice is mailed and posted to abutting, across-the-street and diagonal neighbors within 3 days, followed by a 21-day comment period; the Director’s decision becomes final after 14 days unless a hearing is requested.

Homes over 45 years old may need a historic resource evaluation before demolition, and the Historic Resources Board reviews listed properties.

Construction in Progress

Framing on new construction
Framing on new construction
Insulation
Insulation
Eave and fascia framing
Eave and fascia framing

Ask us about recent new-home and rebuild projects during your consultation.

New-Home Submittal Checklist

  • Boundary and topographic survey, grading and drainage plan, geotechnical report.
  • Deconstruction plans rather than simple demolition.
  • Title 24 energy, CALGreen mandatory plus Tier 2 measures, and electric-ready construction with Palo Alto’s energy design points.
  • T-1 tree protection sheet, stormwater pollution prevention plan and flood checklist.
  • CPAU utilities application for electric, gas, water and wastewater.
  • School fee receipt (PAUSD or LASD).
Palo Alto Development Center
285 Hamilton Avenue, Palo Alto, CA 94301 (next to City Hall at 250 Hamilton)
Building (650) 329-2496, Bu******@******to.gov · Planning (650) 329-2441
In-person counter Monday to Thursday, 8:30 a.m. to 12:30 p.m. and 1:30 to 4:30 p.m.; Friday service is virtual. Applications and payments go through Accela Citizen Access (ACA). Inspections are requested in ACA or the Palo Alto Inspection Request app; finals by phone at (650) 329-2496, option 2.

Explore More

Other Palo Alto services: Bathrooms · Kitchens · Additions · Palo Alto ADU builder · Palo Alto overview

Same service nearby: Mountain View · Los Altos · Los Altos Hills

See our custom home builder page.

Palo Alto New Home Construction FAQ

Must new homes in Palo Alto be all-electric?

No. Enforcement was suspended in February 2024, but new homes must be electric-ready and meet energy design points.

Is deconstruction required?

Palo Alto requires deconstruction plans for new homes.

Can I build a basement in a flood zone?

The lowest floor must be at base flood elevation plus 1 foot, which effectively rules out basements.

Who issues permits?

The City of Palo Alto Development Center.