Kitchen Remodeling in Pleasanton, CA

Get a Free Pleasanton Kitchen Consultation

Kitchens for Pleasanton Homes

From Vintage Hills ranches to Ruby Hill estates, Pleasanton kitchens range from original tract kitchens to large custom spaces. We remove walls, add islands and pantries, upgrade electrical and appliances, and connect kitchens to patios. Axiom Renovation (CA Lic. #1105006) handles design, engineering, permits and construction.

Kitchen Projects

Great room with fireplace and kitchen
Great room with fireplace and kitchen
Paneled refrigerator
Paneled refrigerator
Island with globe pendants
Island with globe pendants
Chartreuse and black cabinets
Chartreuse and black cabinets

New Windows Can Trigger Design Review

An interior kitchen remodel goes straight to building plan check. But Pleasanton’s Administrative Design Review covers new windows and exterior changes over 10 feet in height, so a new window over the sink or a kitchen bump-out can bring in ADR and the 7-day neighbor comment period.

Administrative Design Review (ADR) is required for single-family changes over 10 feet in height, including additions, roof changes, new windows and accessory structures. Adjacent neighbors get 7 days to comment or request a Zoning Administrator hearing. If no hearing is requested, the project is approved administratively, followed by a 15-day appeal period; appeals go to the Planning Commission with a 1,000-foot notice radius. In Ruby Hill and Golden Eagle, an HOA approval letter is part of the ADR submittal.

Building Plan Check Items

  • Stamped structural calculations for removed bearing walls.
  • Title 24 energy compliance, CALGreen documentation, and Pleasanton’s Build It Green checklist where required.
  • Dedicated appliance circuits with GFCI and AFCI protection.

Pleasanton adopted EV-charging and building-electrification reach codes in the 2022 code cycle; we confirm current requirements for your scope.

Pleasanton Permit Center
200 Old Bernal Avenue (next to the City Council Chambers), Pleasanton, CA 94566
Building & Safety (925) 931-5300 · Planning (925) 931-5600, po*@****************ca.gov
Walk-in hours vary by day, so call ahead. Building permits are submitted electronically through Accela Citizen Access.

Inspections: schedule in Accela Citizen Access, by texting “Schedule” to (844) 670-9753, or by calling (925) 931-5322, ext. 1. Inspectors take calls at (925) 931-5300 from 7:30 to 8 a.m. on inspection day.

Explore More

Other Pleasanton services: ADUs · Bathrooms · Additions · New Homes · Pleasanton overview

Same service nearby: Dublin · Livermore · San Ramon

See our kitchen remodeling page.

Pleasanton Kitchen Remodeling FAQ

Does a new kitchen window need design review in Pleasanton?

New windows and exterior changes over 10 feet in height go through Administrative Design Review.

How long do neighbors have to comment?

Adjacent neighbors have 7 days to comment or request a hearing.

Who issues kitchen permits?

The City of Pleasanton Building & Safety Division.

How long does a kitchen remodel take?

Construction usually runs a couple of months.

Get a Free Pleasanton Kitchen Consultation

What our clients say