New Home Construction in Atherton, CA

Get a Free Atherton New Home Consultation

Custom Homes in Atherton

R-1A standards: new lots are 1 acre on flatter land, 2 acres at 20% to 35% slope and 5 acres above that. Floor area is 18% of lot area on lots of an acre or more, with floor area above the first floor capped at 7.5% of the lot. Height is 30 feet (22-foot sidewalls), up to 34 feet with larger setbacks or a Special Structures Permit, measured from average natural grade. Front and rear setbacks are 60 feet. Basements stay within the first-floor footprint, up to 100% of first-floor area, or 120% with a Special Structures Permit.

There is no single-family design review listed in the Town’s approval table; the town planner checks compliance with the standards, and the Planning Commission hears Special Structures Permits, variances and heritage tree removals, with notice mailed within 500 feet at least 10 days ahead.

Construction in Progress

Framing on new construction
Framing on new construction
Utility trenching
Utility trenching
Eave and fascia framing
Eave and fascia framing

Ask us about recent new-home and rebuild projects during your consultation.

New-Home Requirements

  • Electric-ready construction: gas is allowed, but heat-pump space and circuits must be provided.
  • The first parking space Level 2 EV-ready, and a second space, if provided, Level 1.
  • Fire review under the Menlo Park Fire Protection District code.
  • Stormwater, grading and erosion control plans.
  • COP plan before plan check, and a permit time limit of 36 months for homes over 4,000 sq ft.

Heritage trees: a tree is protected at 48 inches in circumference (about 15 inches diameter) at 54 inches above grade. Native oaks qualify anywhere on the lot; other species qualify outside the main buildable area. Staff can approve removal of dead or dangerous trees; other removals go to the Planning Commission, and a heritage oak removed from the buildable area is replaced with a 48-inch box oak.

Construction hours: construction, pickups and deliveries are allowed only 8 a.m. to 5 p.m., Monday to Friday, with no contractor work on Saturdays, Sundays or Town holidays. Construction vehicles cannot arrive before 8 a.m., must leave by 5 p.m., and must turn engines off while loading.

Town of Atherton Building Department
Permits and plan check go through the Town Building Department at Town Hall; call the Town to confirm current counter hours before visiting.
Fire: Menlo Park Fire Protection District, Fire Prevention, 170 Middlefield Road, Menlo Park, (650) 688-8400 · Sewer: West Bay Sanitary District, 500 Laurel Street, Menlo Park, (650) 321-0384.
A Construction, Operation and Parking (COP) plan must be approved by the Building Official before plans go to plan check.

Explore More

Other Atherton services: ADUs · Bathrooms · Kitchens · Additions · Atherton overview

Same service nearby: Menlo Park · Palo Alto · Los Altos Hills

See our custom home builder page.

Atherton New Home Construction FAQ

Must new homes in Atherton be all-electric?

No. They must be electric-ready.

How large can a new home be?

18% of lot area on lots of an acre or more.

What are the setbacks?

60 feet front and rear.

How long is the building permit valid?

36 months for homes over 4,000 sq ft.

Get a Free Atherton New Home Consultation